ON DRAFT
A sign in front of the square in early 2009 said:
Maule Regional Government Project:
Curanipe waterfront park Finance: Regional Government
Amount Maule : 202 592 454 (U.S. $ 350,000 approx.)
taenicide Unit: Maule region
SERVIU Contractor: Paul Aguirre
Tartari Start Date: 24 - January 2008
End Date: 21 - June 2008
PREVIOUS RELATED (26 - December - 2008)
Source:
http://curanipeseagull.blogspot.com/2008/12/plazoleta-frente-al-mercado-de-frutas-y.html
The one that was once was a grass-covered plaza where people used to sit to watch the sunset, participate in musical activities summer or just sunbathing, was the result of a "remodeling project? turned into: a place full of evil-disposed materials-all at half done, pastelones loose playground Flintstones style, with a cement floor instead of sandbox (obviously for splitting the head), where it will be impossible for the elderly to move comfortably, and so on., etc.
Question: Who did
the project and where is the money?
Congratulations to "architect?
MIRADOR: Cototo CONCRETE BUNKER OR ANTI CaƱonazos?
A space should be free to enjoy the people, with a Curanipe spectacular panoramic view, completely covered by a gray and hideous mole constructs a craft fair, I sorry? both unfinished.
palms are added flagging, once thriving, they moved from their original locations, are PLOP! SUMMARY
The space of all Chileans "badly designed?, Covered with architectural monsters, using resources in the trash millionaires, projects that do not serve anyone and as always" pay Moya. "
Included in this review seafood markets 1 and 2, the Municipal Library and the Market for Fruits and Vegetables ...
EXCEPTIONS
The viewpoint behind the campsite, and the little ones, one at the Rock of St. Peter and the other in Puente Blanco. ON THE DRAFT
A sign in front of the square says
Maule Regional Government Project:
Curanipe waterfront park Finance: Regional Government
Maule Amount: 202,592,454 (U.S. $ 350,000 approx.)
taenicide Unit: Maule region
SERVIU Contractor: Paul Aguirre
Tartari Start Date: 24 - January 2008
End Date: 21 - June 2008.
The one that was once was a grass-covered plaza where people used to sit to watch the sunset, participate in musical activities summer or just sunbathing, was the result of a "remodeling project? turned into: a place full of evil-disposed materials-all at half done, pastelones loose playground Flintstones style, with a cement floor instead of sandbox (obviously for splitting the head), where it will be impossible for the elderly to move comfortably, and so on., etc.
Question: Who did
the project and where is the money?
Congratulations to "architect?
MIRADOR: Cototo CONCRETE BUNKER OR ANTI CaƱonazos?
A space should be free to enjoy the people, with a Curanipe spectacular panoramic view, completely covered by a gray and hideous mole constructs a craft fair, I sorry? both unfinished.
palms are added flagging, once thriving, they moved from their original locations, are PLOP! SUMMARY
The space of all Chileans "badly designed?, Covered with architectural monsters, using resources in the trash millionaires, projects that do not serve anyone and as always" pay Moya. "
Included in this review seafood markets 1 and 2, the Municipal Library and the Market for Fruits and Vegetables ...
EXCEPTIONS
The viewpoint behind the campsite, and the little ones, one at the Rock of St. Peter and the other in Puente Blanco. ON THE DRAFT
A sign in front of the square says
Maule Regional Government Project:
Curanipe waterfront park Finance: Regional Government
Maule Amount: 202,592,454 (U.S. $ 350,000 approx.)
taenicide Unit: Maule region
SERVIU Contractor: Paul Aguirre
Tartari Start Date: 24 - January 2008
End Date: 21 - June 2008.